POSITIONING UNIT PE 5

Can be used with all WT 5 workpiece pallets, Compressed air connection: 5 ... 6 bar, Positioning a workpiece pallet in a manual or automated processing station in the longitudinal conveyor with high positioning accuracy requirements (±0.3 mm), Installatio / Material Number:3842998786

POSITIONING UNIT PE 5

Material #3842998786

Request Quote

Attributes

Productgroup ID 2
Weight 0kg
Scope of delivery Incl. fastening material for mounting the PE 5 in ST 5/XH conveyor sections
Delivery information Fully assembled
Recommended accessories Lateral guide cover,Protective sleeves
Required accessories Assembly kit 3 842 996 185 is required for assembly in conveyor sections ST 5/H,VE 5/200, VE 5/D‑300, VE 5/D‑301 or VE 5/D‑1000 stop gate,Switch bracket SH 2/U‑H 3 842 537 289 (Not with size b = 455 mm),Assembly kit SH 2/U‑H 3 842 545 132
Length in direction of transport [lT] 455,650,845,1040
Track width [b] 455,650,845
Positioning unit width [bPE] 441,441,636,636,831,831
Preferred values 455,650,845
Positioning unit length [lPE] 471,576,576,764,764,966
  • Positioning a workpiece pallet in a manual or automated processing station in the longitudinal conveyor with high positioning accuracy requirements (±0.3 mm)
  • Can be used with all WT 5 workpiece pallets
  • Installation from above also possible
  • Lift over transport level: 5 mm
  • Positioning accuracy: ±0.3 mm in x and y direction
  • Permissible vertical process force with center load: up to 4000 N2) regardless of the WT weight
  • Suitable for ST 5/XH and ST 5/H (not ST 5/XH‑FR or ST 5/H‑FR)
  • Compressed air connection: 5 ... 6 bar
  • Push in air connection: 8 mm
  • 2) If assembling in a ST 5/H section place legs directly in front of and behind the PE 5.
  • Permissible vertical process force with center load: up to 4000 N2) regardless of the WT weight - Permissible vertical process force with center load: up to 4000 N2) regardless of the WT weight
  • 2) If assembling in a ST 5/H section place legs directly in front of and behind the PE 5. - 2) If assembling in a ST 5/H section place legs directly in front of and behind the PE 5.
PE 5 Positioning Unit
Can be used with all WT 5 workpiece pallets, Compressed air connection: 5 ... 6 bar, Positioning a workpiece pallet in a manual or automated processing station in the longitudinal conveyor with high positioning accuracy requirements (±0.3 mm), Installatio

Required accessories

Assembly kit 3 842 996 185 is required if assembling in ST 5/H conveyor sections.
VE 5/D-1000 stop gate, VE 5/D-300 stop gate, VE 5/D-301 stop gate or VE 5/200 stop gate
Switch bracket SH 2/U‑H 3 842 537 289 (Not with size b = 455 mm)
Assembly kit SH 2/U‑H 3 842 545 132

Recommended accessories

Lateral guide cover
Protective sleeves

VE 5/200, VE 5/D‑300, VE 5/D‑301 or VE 5/D‑1000 stop gate

VE 5/200, VE 5/D‑300, VE 5/D‑301 or VE 5/D‑1000 stop gate

For non-damped (VE 5/200) or damped (VE 5/D-300 and VE 5/D‑1000) stopping of accumulating workpiece pallets for outfeeding

CAD data

Mounting kit for PE 5 and PE 5/T positioning units

Mounting kit for PE 5 and PE 5/T positioning units

Fastening the PE 5 and PE 5/T positioning unit in the ST 5/H conveyor unit

CAD data

Cover of lateral guide for positioning units

Cover of lateral guide for positioning units

The lateral guide covers are provided on both sides in the vicinity of the PE 5, PE 5/T, PE 5/OC, and PE 5/OC-T positioning units to increase safety.

CAD data

Switch Bracket

Switch Bracket

SH 2/U-H switch bracket Assembly kit for SH 2/U-H switch bracket Accessories, sensor in Open Center assembly kit for SH 2/U-H switch bracket

CAD data

Condition of Delivery

Fully assembled

Scope of delivery

Incl. fastening material for mounting the PE 5 in ST 5/XH conveyor sections

PE 5 Positioning Unit

bWT (mm)

lWT (mm)

bPE (mm)

lPE (mm)

455

455

441

471

455

650

441

576

650

650

636

576

650

845

636

764

845

845

831

764

845

1040

831

966

Assembly kit for installing the PE 5 in the ST 5/H: Material number 3 842 996 185

bWT = Breite Werkstückträger

lWT = workpiece pallet length

bPE = Breite Positioniereinheit

lPE = Länge Positioniereinheit

Set-up, positioning, and orientation

S1

=

WT before VE

S2

=

WT arrival

S3

=

Lift end position at bottom

S4

=

Lift end position at top

S5

=

WT after VE

Y1

=

Open VE (Z1)

Y2

=

WT lift (Z2)

Y3

=

Open VE (Z3)

A1

=

Start of processing

A2

=

End of processing

No.

3842998786

Request Quote

How to Find Us

If you have any questions, just fill in the contact form, and we will answer you shortly. If you are living nearby, come visit us.

Headquarters

1505 W. Hamlin Road
Rochester Hills, MI 48309

Phone
248-584-5600
Fax
248-584-1117

West Michigan Office

Phone
269-381-1285
Fax
269-381-1379

Have questions?